Web & Mobile Development

How to Write a Mobile App Requirements Document

A simple way to turn your app idea into a requirements document that developers can price and build, with a template for UAE projects.

Rahul Mathur · Updated · 18 min read
Illustration of a smartphone showing an app interface for the article: How to Write a Mobile App Requirements Document
In this article
  1. Key takeaways
  2. Why bother with a requirements document?
  3. Requirements document, PRD, SRS, BRD: what is the difference?
  4. What goes in a good requirements document
  5. A simple template you can copy
  6. A worked mini example
  7. Writing good requirements
  8. Prioritising with MoSCoW
  9. User stories and acceptance criteria
  10. Common mistakes
  11. Who should write it?
  12. Using the document to compare vendors
  13. Keeping the document alive
  14. Features most apps need that people forget to write down
  15. What to write for the admin panel
  16. A discovery workshop agenda
  17. A second example: a services marketplace
  18. Reviewing the draft before you share it
  19. How requirements change the price
  20. From document to delivery
  21. Common questions
  22. One last tip
  23. Next steps

The most expensive sentence in app development is "I assumed that was included." A mobile app requirements document is how you stop that sentence from ever being said. It is a plain written description of what your app must do, for whom, and how you will know it works. Done well, it makes quotes comparable, shortens the build, and cuts arguments about scope. This guide shows how to write a mobile app requirements document step by step, with a template you can copy, in language a non-technical founder can follow.

It is the document we ask for at the start of nearly every project, and the one that, when it is missing, we end up helping to write in the first two weeks. You do not need to produce a perfect version. You need a clear enough one that two different teams reading it would build roughly the same app.

Key takeaways

  • A requirements document describes what the app must do and for whom, not how the code will be written.
  • Keep it short and specific: a clear goal, user roles, a numbered feature list, a few rules, and what is out of scope.
  • Use it to get comparable quotes from several agencies and to avoid scope fights later.
  • Mark each feature as must have, should have or could have, so the first release stays focused.
  • Treat it as a living document. Update it when decisions change and keep a version history.

Why bother with a requirements document?

Founders often skip this step because they are excited to start, or because an agency says it will "figure it out in discovery". Both are understandable. Both lead to the same trouble: each side imagines a slightly different app, and the differences appear as invoices.

A written document gives you four concrete advantages.

  1. Comparable quotes. If three agencies quote on a vague idea, you will get three different prices for three different apps. If they quote on the same document, the differences mean something.
  2. Fewer surprises. Hidden features such as an admin panel, Arabic support or refund handling come up on day one, not at launch.
  3. A better build. Developers make better decisions when they understand the goal and the users.
  4. Clear acceptance. At the end, you can check the finished app against the list. See how this ties into the contract and the testing checklist.

It also forces you to think. Many ideas improve or shrink sensibly just by being written down.

Requirements document, PRD, SRS, BRD: what is the difference?

You will meet several acronyms. They overlap, and for a first app you do not need all of them.

  • BRD (business requirements document): why the project exists, the business goals and the expected benefits. It is written in business terms.
  • PRD (product requirements document): what the product must do, from the user's point of view. This is the main one for most app projects.
  • SRS (software requirements specification): a detailed technical description, more formal, often used in larger or regulated projects.
  • Functional specification: a deeper description of how each feature behaves.

For a typical startup or small business app, one document that combines business goals, user roles and a feature list is enough. Your agency can expand it into more detailed specifications during discovery. If you are unsure how the project unfolds after this document, read our guide to the mobile app development process.

What goes in a good requirements document

Here are the sections we recommend, in order. Each one has a short explanation and an example of what to write.

1. Overview and goal

Two or three sentences. What is the app, who is it for, and what problem does it solve? Include one measurable goal.

Example: "A mobile app that lets customers of our three car wash branches book and pay for a wash, so we can reduce phone bookings by half within six months."

2. Background and users

Describe the business context and the people who will use the app. List each user role, because every role usually needs its own screens.

  • Customer: books, pays, tracks.
  • Staff or provider: receives jobs, updates status.
  • Admin: manages prices, users, reports and refunds.

For each, note their main goals, their experience with technology and the devices they use. Roles you forget at this stage return as expensive additions later.

3. Platforms and technology preferences

State which platforms you need: iPhone, Android, a web admin panel, a website. Mention any constraints: minimum operating system versions, existing systems to connect to, or required cloud provider. If you are undecided, say so and ask vendors for a recommendation. Our article on native, cross-platform or PWA explains the choice.

4. Features, as a numbered list

This is the core of the document. Number every feature so you can refer to it later. Group them by area, such as accounts, browsing, ordering, payments, notifications and admin. Write each in a simple form: "The user can... so that...".

  • F1. The customer can sign up with phone number and verify with a one-time code.
  • F2. The customer can choose a service, date and time slot.
  • F3. The customer can pay by card or wallet and receives a receipt.
  • F4. The admin can create services, set prices and block time slots.

Mark each as must have (the app is pointless without it), should have (important but can wait a release) or could have (nice extra). This simple ranking is one of the best tools for keeping a first version affordable.

5. User flows and screens

Describe the main journeys in steps, or sketch them. They do not have to be beautiful. Hand-drawn boxes on paper, photographed, are far better than nothing. A good test is to ask someone to follow your flow and see where they get lost.

6. Business rules

The rules your business already follows must be written down, because developers cannot guess them. Examples:

  • Cancellations within 24 hours are charged 50 percent.
  • Delivery is free above a set order value.
  • Providers are paid weekly after a commission is deducted.
  • A promo code can be used once per customer.

7. Integrations

List every external system the app must talk to: payment gateway, SMS provider, maps, email, CRM, ERP, accounting or point of sale, analytics, delivery partners. For each, note whether you have an account already.

8. Languages and localisation

State that you need Arabic and English, with right-to-left layouts, and what else, if any. Say who will supply translations. See Arabic app localisation and RTL for UAE apps for the details you need to cover.

9. Non-functional requirements

These describe qualities rather than features:

  • Performance: how fast screens should load and how many users the system should handle.
  • Security: how data is protected, password rules, roles and permissions. See mobile app security and data protection in the UAE.
  • Availability: uptime expectations and how problems are handled.
  • Compliance: data protection, sector rules, accessibility.
  • Compatibility: supported devices and OS versions.

10. Out of scope

List what you are not asking for in this version. This avoids a lot of assumption. Typical entries: a customer web portal, multi-country expansion, a loyalty programme, an in-app chat, Android tablet support.

11. Success measures

Say how you will know the project worked: downloads, active users, orders per week, repeat rate, reduced call volume, rating in the stores. Even rough targets help the team prioritise.

12. Timeline, budget and constraints

Give your target launch date and what drives it (an event, a season, a funding milestone). Share a budget range if you are comfortable doing so; it helps agencies propose something realistic rather than guess. For benchmarks, see how much an app costs in Dubai and how long it takes.

13. Risks and assumptions

Write what you are assuming (the payment provider will approve our account in two weeks) and what could go wrong (content will not be ready in time). Naming risks makes them manageable.

A simple template you can copy

Paste this outline into a shared document and fill it in.

  1. Project name and date (and version number)
  2. Overview: what, for whom, why, one measurable goal
  3. Users and roles: names, goals, devices
  4. Platforms: iPhone, Android, web admin, website
  5. Feature list: numbered, with must, should or could
  6. Main user flows: steps or sketches
  7. Business rules: prices, fees, cancellations, payouts
  8. Integrations: systems, accounts, owners
  9. Languages: Arabic, English, others
  10. Quality requirements: speed, security, compliance
  11. Out of scope: what is not included
  12. Success measures: numbers to check
  13. Timeline and budget: target date and range
  14. Risks and assumptions
  15. Open questions: things you still need to decide

A worked mini example

To show how this looks in practice, here is a shortened, invented requirements summary for a neighbourhood bakery chain wanting an ordering app.

SectionEntry
GoalLet customers pre-order for pickup at any of four branches and cut queue time at peak hours.
RolesCustomer, branch staff, head office admin
PlatformsiPhone and Android app; web admin panel
Must haveF1 phone sign-up; F2 browse menu by branch; F3 choose pickup time; F4 pay online; F5 order notification to branch; F6 admin menu and price edit
Should haveF7 reorder previous order; F8 loyalty stamps
Could haveF9 gift cards; F10 delivery
RulesOrders close 30 minutes before pickup; sold-out items hidden automatically; VAT shown on receipt
IntegrationsPayment gateway; existing POS for stock; SMS for codes
LanguagesArabic and English with RTL
Out of scopeDelivery, subscriptions, catering orders
SuccessThirty percent of pickup orders through the app within three months

That single page already lets an agency give a meaningful estimate, and lets you tell at a glance whether a quote has missed anything.

Writing good requirements

Quality matters more than length. Use these habits.

Be specific and testable

"The app should be fast" cannot be tested. "The menu loads within two seconds on a standard mobile connection" can. "Easy to use" becomes "a new user can place an order within three minutes without help".

One requirement per line

If a sentence contains "and", it may be two requirements. Split them so each can be built and checked separately.

Use plain words

Avoid technical jargon and define unusual terms. The document should be readable by your team, your agency and your lawyer.

Describe the outcome, not the solution

"Users can find a nearby branch" leaves room for the best design. "Add a map with pins" may lock you into a weaker solution.

Include the unhappy paths

What happens when payment fails, an item sells out, the internet drops or a user enters the wrong code? Those cases are a big part of the real work.

Show, don't only tell

Screenshots of apps you like, sketches and links make requirements richer. Label what you like about each example so the team does not copy things you did not mean.

Prioritising with MoSCoW

MoSCoW is a simple way to rank features: Must have, Should have, Could have, and Won't have (this time). It helps you decide what goes into the first release.

  • Must: without it, the app does not deliver its main value or is not legal or safe to launch.
  • Should: important, with a workaround for now.
  • Could: desirable if time and budget allow.
  • Won't (now): agreed, recorded, and left for later.

A useful trick is to ask: "If we launched without this, would customers still use the app?" If the answer is yes, it is not a must. Be honest. Most first releases carry too many musts.

User stories and acceptance criteria

Many teams phrase features as user stories: "As a customer, I want to reschedule a booking so that I do not lose my payment." Each story gets acceptance criteria, a short list of conditions that must be true when it is done:

  • The customer can pick a new slot from the available options.
  • The old slot becomes available again.
  • The provider and customer both receive a confirmation.
  • Rescheduling is blocked less than two hours before the start time.

This is useful at the testing stage because the criteria become the test cases. They also make estimates more accurate.

Common mistakes

Writing a solution instead of a need

"Use Flutter and Firebase" is a technical choice and should come from the team after discussion. State the need and constraints first.

Copying a famous app wholesale

"Like Uber" is a starting point for a conversation, not a requirement. Describe which parts you want and for whom. Features that suit a billion-dollar company may not suit your first release.

Forgetting the admin panel

Every app needs a way for staff to manage content, users, orders and reports. It is often a large part of the work, and the most overlooked.

Ignoring post-launch needs

Analytics, crash reporting, support tools and updates are real requirements. See mobile app maintenance cost in the UAE.

Locking everything too early

Detail what you know and flag what you do not. Over-specifying uncertain parts creates false confidence.

Not involving the right people

Ask the people who will use the app, and the staff who will run it. A thirty-minute chat with a branch manager often reveals rules the owner forgot.

Who should write it?

Ideally, you. You know your customers and business best. If you are busy or uncertain, there are several ways to get help:

  • A discovery workshop with your agency, where they ask questions and draft the document with you.
  • A business analyst or product consultant who writes it independently of any vendor.
  • A shared draft, where you write the goals and rules and the agency adds the technical parts.

Paying for discovery is often worthwhile. It turns an idea into something an agency can price and build, and the document is yours to take to other vendors. Make sure the contract says so.

Using the document to compare vendors

Send the same document to each agency and ask for a written estimate. Then compare:

  1. Did they understand the goal and ask good questions?
  2. Does each quote cover every must-have feature?
  3. What assumptions and exclusions are listed?
  4. Do they propose a sensible platform choice, with reasons?
  5. Is testing, security, Arabic support and maintenance included?
  6. Are timeline and team size realistic?

When estimates differ widely, find out why before choosing the cheapest. Often one vendor has priced something the others missed. Our guide on how to choose an app development company goes further.

Keeping the document alive

A requirements document is not a one-off. Treat it as a reference that changes through the project.

  • Keep a version number and a short change log.
  • Record every approved change, with the date and who approved it.
  • Move ideas that are out of scope into a separate "later" list.
  • Review it after each milestone and again before testing.
  • After launch, use it as the basis for the next release.

This habit also helps when team members change, because the reasoning behind decisions is written down.

Features most apps need that people forget to write down

Founders usually remember the exciting features and forget the plumbing. Check your list against these, because each one costs real time.

Accounts and security

  • Sign up, login, logout, password reset and email or phone verification.
  • Profile editing, delete account and data export where required.
  • Roles and permissions for staff.
  • Session handling and protection against repeated failed logins.

Notifications and messages

  • Push notifications, with settings so users can choose what they get.
  • Emails and SMS for confirmations, receipts and resets.
  • Templates in Arabic and English that your team can edit.

Payments and money

  • Payment methods, saved cards or wallets, receipts and invoices.
  • Refunds, partial refunds and failed payment handling.
  • Commission, payouts and statements if you run a marketplace.
  • VAT calculation and reporting.
  • Search, filters and sorting with sensible empty states.
  • A way for staff to add and edit content without a developer.
  • Image upload, resizing and moderation where users can post.

Support and trust

  • Help centre, contact form or chat.
  • Ratings and reviews, with a way to report abuse.
  • Terms, privacy policy and consent screens.

Operations and reporting

  • Admin dashboard with orders, users, revenue and exports.
  • Activity logs for sensitive actions.
  • Analytics events that match your success measures.
  • Crash reporting and monitoring.

Technical housekeeping

  • Handling of poor or missing internet connections.
  • App updates and forced update for critical fixes.
  • Backups and a way to restore data.
  • Separate test and live environments.

Many of these form the "invisible" half of a project. Seeing them in a document lets you compare vendors who include them with those who forgot them.

What to write for the admin panel

The admin panel is how your business actually runs the app, so describe it with the same care as the customer side. Think about the daily tasks of your team:

  1. Who needs to log in, and what should each person see?
  2. What do they do every morning? (Check new orders, approve providers, reply to reviews.)
  3. What numbers do you want on the first screen?
  4. Which things must be editable without a developer: prices, banners, categories, promo codes, delivery zones, opening hours?
  5. Which reports do your finance and management teams need, and in what format?
  6. Which actions need an approval or an audit trail, such as refunds or price overrides?

Ask the people who will use the panel to review the list. They will remember tasks that the owner never does personally.

How long the build takes
Basic app2 to 3 monthsMedium app3 to 5 monthsAdvanced app5 months or more0m2m4m6m8m10m

Source: Arka Softwares typical timelines, from kick-off to launch. Scope changes the timeline.

A discovery workshop agenda

If you work with an agency to write the document, a half-day workshop is an efficient format. A sensible agenda looks like this:

  1. Goals and success measures (30 minutes). Why this project, what does success look like in numbers?
  2. Users and journeys (60 minutes). Walk through each role from first contact to repeat use. Draw the steps on a whiteboard.
  3. Feature brainstorm and ranking (60 minutes). Capture ideas, then rank them with MoSCoW. Be strict about musts.
  4. Rules and integrations (45 minutes). Pricing, fees, cancellations, payouts, systems to connect.
  5. Risks and constraints (30 minutes). Dates, budget, regulation, content, approvals.
  6. Next steps (15 minutes). Who writes what, by when, and when you will review the draft.

Bring real examples: screenshots of apps you like, customer feedback, current process documents and sample data. The workshop works best when the people who run the business attend, not only the owner.

A second example: a services marketplace

Here is another invented, shortened example, this time for a platform connecting customers with home service providers. It shows how a more complex product breaks into roles and rules.

  • Goal: connect customers with verified providers for cleaning, repairs and moving, and take a commission from each booking.
  • Roles: customer, provider, support agent, admin.
  • Customer must haves: browse services, request a quote or book a fixed-price service, chat with the provider, pay securely, rate the job.
  • Provider must haves: register and upload documents, set availability and service area, accept or decline jobs, update job status, see earnings.
  • Admin must haves: verify providers, manage categories and prices, set commission rates, handle disputes and refunds, view revenue reports.
  • Rules: commission rate varies by category; payment is held until the customer confirms completion or 48 hours pass; providers with low ratings are paused automatically for review.
  • Integrations: payment gateway with split payouts, SMS and WhatsApp notifications, maps for address and travel time, identity check service.
  • Out of scope for version one: subscriptions for customers, a provider marketplace for tools, multi-city expansion.

Notice how the rules sentence does a lot of work. Payment holding and automatic pauses affect database design, notifications, and support processes. If they were not written down, they would appear halfway through development as a "small change". If you plan a marketplace, our article on monetization models will help you think through the commission rules.

Reviewing the draft before you share it

Before you send the document to vendors, read it once as a stranger would.

  • Could a developer who has never met you understand what to build?
  • Is every feature numbered and ranked?
  • Does every role have a way to do the job you want them to do?
  • Are rules, numbers and names consistent across sections?
  • Are open questions listed, with an owner and a date?
  • Have you removed anything that is only a wish, or marked it as could-have?
  • Has someone outside the project read it and asked questions?

Fresh readers find gaps quickly. If a colleague asks "what happens if...?" more than a few times, the document needs another pass.

How requirements change the price

Every line in a requirements document moves the estimate in some direction. Knowing which lines are expensive helps you decide where to be strict.

  • Number of user roles. Each role usually means its own screens, permissions and testing.
  • Real-time features. Live tracking, chat and instant updates need more infrastructure than screens that refresh on demand.
  • Payments and money movement. Splitting payments, payouts and refunds are among the most detailed parts of any build.
  • Custom design. Unique illustrations, animations and bespoke interactions take longer than standard components.
  • Integrations. Each connected system adds work, and poorly documented ones add more.
  • Two platforms and two languages. Arabic with proper right-to-left layout touches every screen.
  • Admin panel depth. Reporting, approvals and audit logs multiply screens quickly.

As a reference, our own indicative single-platform bands, before VAT, are roughly USD 5,400 to 7,200 for a basic app, USD 9,000 to 14,400 for a medium app, and USD 14,400 or more for an advanced one. Where your document sits depends on the lines above. If a quote surprises you, go back to the list and ask which lines drive the difference.

From document to delivery

Once the document is stable, it feeds everything that follows.

  1. Estimation. The agency breaks each feature into tasks and estimates time.
  2. Design. Wireframes and visual designs are built around the user flows.
  3. Development. Features are built in order of priority, and each is checked against its acceptance criteria.
  4. Testing. The list becomes the test plan.
  5. Launch. Store listings and training material draw on the same descriptions.
  6. Next version. Items from the should-have and could-have lists, plus lessons from real users, form the roadmap.

Seen this way, the document is the spine of the project. Time spent on it early is repaid many times as questions, quotes, tests and handovers all become easier.

Common questions

How long should it be?

As long as needed and no longer. For a simple app, five to ten pages is typical. For a complex platform, it may be much longer. Clear and short beats long and vague.

Do I need wireframes?

They help a lot. Even rough sketches reduce misunderstandings. Your agency will usually make proper wireframes in the design phase.

Can the agency write it for me?

Yes, often as part of a paid discovery phase. Review it carefully and make sure it reflects what you want, not only what is easy to build.

What if I do not know all the details?

That is normal. Write what you know, list open questions, and agree how and when they will be answered.

How much detail is too much?

Detail that you cannot yet justify. If you are guessing, mark it as an assumption.

Does the document protect my idea?

It does not by itself. Sign a non-disclosure agreement before you share sensitive details, and ensure the contract covers ownership of the work.

One last tip

Read your document aloud to someone who does not work in your industry. Wherever they look puzzled, add a line of explanation or an example. Clear writing at this stage saves you from explaining the same thing five times to five different people later, and it makes the whole project calmer for everyone involved.

Next steps

Write a first version this week. Set a timer for two hours, fill in the template above, and flag every question you cannot answer. Then share it with two or three agencies and see how they respond; their questions will teach you as much as their quotes. If you would like help turning your idea into a clear scope, our team can walk through it with you. Explore our mobile app development service, or read the complete guide to mobile app development in the UAE to see how the requirements document fits into the larger journey.

Frequently asked questions

How long should a requirements document be?

Two to five pages is plenty to get accurate quotes. Clarity matters more than length.

Do I need technical knowledge to write one?

No. Describe your goal, your users and the features you need in plain language. Your developer will refine it.

Should I include my budget?

Yes. A budget range helps a developer suggest what is realistic instead of guessing.

Let’s build something great together!

Just take one step forward and we can build history.

0 + 0 =
(Max 10MB)